Kembali
ANTM – Exploration costs reached IDR17.43 bn in 1Q24
22 April 2024
ANTM – Exploration costs reached IDR17.43 bn in 1Q24 Aneka Tambang (ANTM) booked gold, nickel and bauxite exploration costs of IDR17.43 bn in 1Q24. Gold exploration is carried out in Pongkor, West Java, with underground drilling and surface drilling. Nickel exploration was carried out in Pomalaa, Southeast Sulawesi with geological mapping, core sampling, core logging, grid measurement & remeasurement, meterstick installation and single tube drilling. Bauxite exploration was carried out in Tayan, West Kalimantan with geological mapping, grid/polygon measurements, geodetic GPS measurements, logging test holes, test hole sampling and rock measurements. (Source : Kontan)