Back
ANTM - Aneka Tambang (Persero)

ANTM – Exploration costs reached IDR17.43 bn in 1Q24

22 April 2024

ANTM – Exploration costs reached IDR17.43 bn in 1Q24 Aneka Tambang (ANTM) booked gold, nickel and bauxite exploration costs of IDR17.43 bn in 1Q24. Gold exploration is carried out in Pongkor, West Java, with underground drilling and surface drilling. Nickel exploration was carried out in Pomalaa, Southeast Sulawesi with geological mapping, core sampling, core logging, grid measurement & remeasurement, meterstick installation and single tube drilling. Bauxite exploration was carried out in Tayan, West Kalimantan with geological mapping, grid/polygon measurements, geodetic GPS measurements, logging test holes, test hole sampling and rock measurements. (Source : Kontan)

Related Research

Mining
ANTM - Pinning hopes on nickel
Devi Harjoto 28 September 2022 See Detail
Mining
ANTM - From mining excellence to powering the future
Benyamin Mikael 12 January 2024 See Detail
Mining
ANTM - EV development prompts to brighter future
Devi Harjoto, Alfiansyah 30 May 2022 See Detail